- Unit Descriptor (Degree)
- Unit Descriptor (HND)
- Unit Programme S2 2009-10 (CEM / HND / PD / PDQS)
- Group Lists (to follow - check your Portal Timetable)
- Risk Assessment
PowerPoint Presentations
(These are NOT a subsitute for attendance at lectures, tutorials and fieldwork sessions)
- Levelling
- Introduction to Engineering Surveying
- Introduction to Levelling
- Levelling summary
- Levelling example - leads to a partially-completed booking form
- Levelling continued - leads to a fully-completed booking form
- Example of Levelling plan sketch, suitable for Level Test
- Levelling tutorial
- Levelling errors
- Two-peg test
- Levelling tutorial - and solution
- Levelling summary sheet
- Theodolites
- Horizontal and vertical angles
- Setting up a theodolite summary sheet (pdf)
- Theodolite sighting
- Collimation errors and face-left / face-right sighting
- Horizontal angle booking (6 second instrument)
- Theodolite errors - instrument checks
- Vertical angle reading and booking (6 second instrument)
- Co-ordinate systems and horizontal control
- Co-ordinates and Rectangular to Polar conversion
- Introduction to horizontal control and traverse computation
- Traverse computation - linear misclosure correction and calculation of final co-ordinates