21 44 ... 11192021222331 ...
201 210 433

:

  1. #201
    Status
    Offline
      eng.ahmedsalem
    20%
    Jun 2009
    72
    0



  2. #202
    Status
    Offline

    20%
    Aug 2009
    52
    0


  3. #203
    Status
    Offline
      Mohamed Hashem
    80%
    Apr 2009
    ALex, EGYPT
    1,576
    7103

    eng.ahmedsalem





  4. #204
    Status
    Offline
      Mohamed Hashem
    80%
    Apr 2009
    ALex, EGYPT
    1,576
    7103








  5. #205
    Status
    Offline
      eng.ahmedsalem
    20%
    Jun 2009
    72
    0

    Mohamed Hashem






  6. #206
    Status
    Offline
      Mohamed Hashem
    80%
    Apr 2009
    ALex, EGYPT
    1,576
    7103



    San Staefano Marina & Privet Beach

    Introduction
    To construct any project beside shore as marina, roads, brides and private beach at first shall know the natural of working areas so sea bed survey should be carried out at first to know sea bed nature (rock, sand or mud) water depth water current and waves force also
    Weather condition (wind speed, direction and swell) should be taken into confederation
    Previous data affects design of these projects such as concrete (shapes, weight and friction ) and layers specification

    Layers
    According to design and sea bed survey 3 layers to be installed as follow
    Layer 1 core layer
    This layer of small rocks which weights between 10 100 kg made of basalt this layer height and slop to be determined according to engineering

    Layer 2 under layer

    This layer consists of rocks bigger than first layer these rocks weights between 1- tons of basalt also
    This layer to fix the core layer

    Layer 3 Armor layer
    This layer consists of concrete blocks weights between 10 -25 tons made of special king of cement. This layer takes different shapes according to design

    Note:
    All layer height, slop and weight to be done according to engineering
    Different shapes of concrete blocks due to different sea state, wave forces, current, wave height and wind speed

    Work Scenario:
    Installation of the up mentioned layers to be performed by two phases
    Phases 1 (underwater activities)
    Hydrographic survey shall be carried out to determine the working area and divers to install markers buoys at the boundaries of this area.
    According to sea bed nature (sand or mud) filter must be installed under core to prevent all layers from falling down. Filters to be divided into two kind Geotexile and micro rocks
    Marine unite (special type of floating Barges) start to transfer core rocks to sea bed according to engineering, divers to check layer till it reaches specified height also check slope then start installing under layer rocks till it reached sea level taking into consideration marine unit draft.
    This marine unit is towed by tug boat and could be loaded by core layer rocks weight about 15 tons each trip and makes 10 to 15 tripe per according to weather condition, also using excavator above pontoon

    Phase 2 (above water activities)
    After finishing phase 1 and check height and slope of core and under layers using divers, installing armor layer concrete block using excavator and cranes (floating and Landing)
    Also during installation check slope and height using divers and surveyors the floating crane capacity 130 tons to transfer 4 concrete blocks during trip to put these blocks close to land crane which capacity 30 tons

  7. #207
    Status
    Offline
      eng.ahmedsalem
    20%
    Jun 2009
    72
    0




    ڿ


  8. #208
    Status
    Offline
      Mohamed Hashem
    80%
    Apr 2009
    ALex, EGYPT
    1,576
    7103

    eng.ahmedsalem



    ڿ



    .. ..
    ..

  9. #209
    Status
    Offline
      eng.ahmedsalem
    20%
    Jun 2009
    72
    0




  10. #210
    Status
    Offline
      eng_ahm_8
    10%
    Aug 2009
    1
    0